LengthMEP
Measures MEP component lengths and prepares quantity schedules in Revit.
DQ ProjectsSynchronizes selected parameters across Revit MEP networks and electrical run schedules.

Data Ctrl transfers selected parameter values through Revit MEP networks containing conduits, cable trays, ducts, or pipes. For conduit and cable tray systems, it synchronizes values between the network and its run schedule when either changes. It can update a single run, an entire run, or connected elements when individual elements are edited. The add-in also exports schedules to Excel files, copies parameter values between runs, and transfers equipment names to selected runs.
Pushes selected parameter values through conduit, cable tray, duct, and pipe networks.
Transfers parameter changes between conduit or cable tray networks and their run schedules.
Updates a single run, an entire run, or all connected elements when network elements are edited.
Copies parameter values from one run to multiple other runs.
Copies an equipment name value to selected runs.
Combine Parameters fills a parameter by combining values from other parameters for use in schedules and element properties. Data Ctrl instead synchronizes selected parameter values across MEP networks and conduit or cable tray run schedules, and can copy values between runs.
| Name | Pricing | Deployment | Updated |
|---|---|---|---|
| this plugin | Paid | Desktop | |
| Combine Parameters | Free | Desktop |
555 plugins in Revit · Productivity & Utilities
Price distribution: 176 free, 1 freemium, 378 paid
Measures MEP component lengths and prepares quantity schedules in Revit.
DQ ProjectsBends MEP elements and manages linked-model views in Revit.
Greater BIMProvides 31 tools for MEP system modeling, coordination, electrical work, and data exchange in Revit.
BIM SOFT SOLUTIONSAutomates MEP modeling, electrical documentation, data management, and Dutch BIM basis IDS tasks in Revit.
DIBS42«Data Ctrl automatically pushes parametric information through the entire MEP network, maintaining up-to-date parameter values as you modify the network's elements. For electrical networks such as conduits and cable trays, Data Ctrl pushes the parameter values to the Run Schedule. If any changes are made to the Run …»